logo

TECON Concrete Form Timber Beam Floor Slab Flex H20 Formwork

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


TECON Concrete Form Timber Beam Floor Slab Flex H20 Formwork - Image

More TECON Concrete Form Timber Beam Floor Slab Flex H20 Formwork images

Tecon H20 Timber Beam Slab Formwork - Buy Slab Formwork

For climbing formwork. self-climbing platform. plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam. TECON-Form Shuttering. the lead time is from 15 to 25 days. For other system. the lead time is from 30 to 45 days.

Supporting head H20 DF | Dokaflex 30 tec | Timber-beam floor

Beam H20 top Beam H20 eco, Composite formwork beams ,,, Timber-beam floor formwork, Dokaflex 30 ,,, Tie rod system 15,0 Tie rod system 20,0 Tie rod system 26,5 Form ,,,

Highly Efficient H20 Timber Beam Slab Table Concrete Formwork

The preparation of loading will be within 10 to 15 days_ For H20 timber beam; TECON:Form Shuttering; the lead time is from 15 to 25 days_ For other system; the lead time is from 30 to 45 days_ For more accurate lead time; please contact us for specific product based on your quantity_

TECON Slab Table Formwork Shuttering For

TECON Slab table formwork is one of the most efficient slab shuttering solution, especially for large area and multiple floors structure! Slab table can be quickly moved into the next floor by single crane lift due to pre,assembled tables combined with H20 timber beam, plywood and heavy duty prop etc!

Lianggong H20 Timber Beam Construction Shuttering for Slab

Lianggong H20 Timber Beam Construction Shuttering for Slab Concrete The Flexible, Grid Efficient Slab Formwork for the simplest assembly with the highest work safety` The lightweight Slab Formwork is used for constructing residential and multi-story buildings` Slab thicknesses up to 33 cm can be realized with the formwork`

Connector clip H20 | Dokaflex 30 tec | Timber-beam floor

Beam H20 top Beam H20 eco. ... Timber`beam floor formwork. Dokaflex. ... Plumbing accessories Multi`trip packaging Release`agents Fair`faced concrete Frame hole plugs ...

Connector clip H20 | Dokaflex 30 tec | Timber-beam floor

Beam H20 top Beam H20 eco, ,,, Timber|beam floor formwork, Dokaflex, ,,, Plumbing accessories Multi|trip packaging Release|agents Fair|faced concrete Frame hole plugs ,,,

TECON Timber Formwork, Timber Formwork Shuttering For

Timber Formwork TECON Timber formwork mainly includes BASE 20 Wall Formwork- Flex 20 Slab Formwork- Slab Table Formwork and BASE 20 Column Formwork| By combine with different components such as film faced plywood- steel waler and steel prop etc|- all above timber formwork can be assembled and used for wall- column- slab and beam casting|